OPTA Arquitectos

HIGH SPEED RAILWAY STATION IN SEGOVIA

Project of an intermediate station on the high-speed railway between Madrid and Valladolid. Functionally it’s both a station and a railway tunnel control center. The main building stands on a wide platform over the tracks, which run half-buried. A series of alabaster “light wells” drill the roof to introduce filtered natural light into the station. Project OPTA/TIFSA Site work management GIF

Pays Espagne
Année 2002-2004
Organisateur GIF (ADIF)
Ingénierie TIFSA / INECO
Contributeurs Arch. J.M. Serrano et J.L. Gomez de Tomas
Construction Constructora Hispánica
  • High Speed Railway Station in Segovia - Spain
  • High Speed Railway Station in Segovia - Spain
  • High Speed Railway Station in Segovia - Spain
  • High Speed Railway Station in Segovia - Spain
  • High Speed Railway Station in Segovia - Spain
  • High Speed Railway Station in Segovia - Spain
  • High Speed Railway Station in Segovia - Spain
  • High Speed Railway Station in Segovia - Spain
  • High Speed Railway Station in Segovia - Spain
  • High Speed Railway Station in Segovia - Spain

Otros proyectos en Transporte