HIGH SPEED RAILWAY STATION IN SEGOVIA
Project of an intermediate station on the high-speed railway between Madrid and Valladolid. Functionally it’s both a station and a railway tunnel control center. The main building stands on a wide platform over the tracks, which run half-buried. A series of alabaster “light wells” drill the roof to introduce filtered natural light into the station. Project OPTA/TIFSA Site work management GIF
Country | Spain |
---|---|
Year | 2002-2004 |
Promoter | GIF (ADIF) |
Engineering | TIFSA / INECO |
Collaborators | Arch. J.M. Serrano, J.L. Gomez de Tomas |
Builder | Constructora Hispánica |